Skip to content

FLL Session 5 (Sprint Session 1): Strike Team Breakouts, Digital Logo Prototypes & 3-Track Robot Missions โ€” Lego Legends

Date: Sunday, October 25, 2026
Time: 1:00 PM โ€“ 4:00 PM (180 Minutes)
Attendees: Team Members (9 Kids), Mentors & Coaches
Season Phase: Competition Build Sprint Phase โ€” Rapid Prototyping, Strategy Specialization & Mission Coding

[!IMPORTANT]

๐Ÿงญ Coaching Architecture: Moving from Discovery into Parallel Execution

Today kicks off our high-gear 5-session sprint leading up to the November 29 Tournament Event. With only 5 in-person meetings remaining before game day, we transition from open-ended exploration into structured, parallel execution.

  1. Innovation Strike Teams (1:10 โ€“ 2:00 PM): After a mentor demonstration modeling a concise pitch and confident Q&A, the squad splits into 3 specialized strike teams (Builders, Researchers, Marketers) to tackle parallel project tracks. Every single student must speak in the final share-out!
  2. Team Identity & Branding (2:00 โ€“ 2:10 PM): Review coach-provided digital logo mockups and gather team feedback on custom color palettes, typography, and symbol tweaks.
  3. 3-Track Robot Game Sprints (2:20 โ€“ 3:50 PM): 90 minutes of dedicated robot table work split across Team A (Static missions), Team B (Dynamic missions), and Team C (R&D scouting), rotating roles every 15 minutes. The mantra is reliable points, not perfection!

๐Ÿ“Œ Coach's Prep & Materials Checklist

  • Innovation Project Materials:
  • Whiteboard, dry-erase markers, sticky notes, and timer display.
  • Research binders, articles on paper usage, defaunation, and forest biodiversity.
  • Prototype materials: cardboard, craft foam, pipe cleaners, LEGO Technic beams, rubber bands, glue dots.
  • Innovation Project Worksheets and Deforestation Worksheets.
  • Team Branding Materials:
  • Digital display/laptop showing coach-designed logo concept variations for "Lego Legends".
  • Color swatch cards and feedback tally sheet.
  • Robot Game Station:
  • Official BIOGLOW competition mat and verified mission model setup.
  • 2 SPIKE Prime hubs with fully charged battery packs + charging cables on standby.
  • 2 programming tablets/laptops with SPIKE Prime app open.
  • Scoring Calculator open on tablet for score tracking.
  • Notebook for recording run times and reliability percentages.

๐Ÿ•’ Master Timeline Overview (1:00 PM โ€“ 4:00 PM โ€ข 180 Min)

gantt
    title Session 5 Timeline (Sunday, Oct 25 โ€ข 180 Minutes)
    dateFormat HH:mm
    axisFormat %H:%M

    section Kickoff
    Arrival, Stand-Up & Goals      :13:00, 10m

    section Innovation
    Mentor Demo & Modeling         :13:10, 4m
    Strike Team Breakouts          :13:14, 26m
    Group Findings (All Speak)     :13:40, 10m
    Core Values Team Challenge     :13:50, 10m

    section Identity
    Digital Logo Prototype Review  :14:00, 10m

    section Recharge
    Bio Break & Snack Reset        :14:10, 10m

    section Robot Game
    3-Track Mission Coding (90m)   :14:20, 90m

    section Wrap-Up
    Pack-Up, LEGO Sort & Shout-Outs :15:50, 10m

๐Ÿ“‹ Minute-by-Minute Session Plan

1:00 โ€“ 1:10 PM | Arrival, Stand-Up & Kickoff (10 min)

  • Welcome & High-Fives (3 min): Fast energy check-in. Students put bags in cubbies and grab their team lanyards.
  • Stand-Up Circle & Sprint Goals (7 min):
  • Announce the countdown: "We have exactly 5 sessions before our November 29 competition showcase! Today is about focused teamwork and reliable execution."
  • Goal 1 (Innovation): Launch our 3 Strike Teams (Builders, Researchers, Marketers) with every team member speaking during presentations.
  • Goal 2 (Identity): Critique and refine our official team logo.
  • Goal 3 (Robot Game): 90 minutes of parallel mission coding across 3 tracks (Team A, Team B, Team C), prioritizing repeatability over flashiness.
  • Review role assignments with Machamp (Timer Lead) and Psyduck (Inclusion & Stress Spotter).

1:10 โ€“ 2:00 PM | Block 1: Innovation Project (50 min)

flowchart LR
    Demo["๐ŸŽค Mentor Demo<br/>2m Pitch + 2m Q&A<br/>(1:10 - 1:14)"] --> Split["๐Ÿ”€ Strike Team Breakouts<br/>Builders โ€ข Researchers โ€ข Marketers<br/>(1:14 - 1:40)"]
    Split --> Pitch["๐Ÿ“ข Present Findings<br/>2m / Group (All Speak!)<br/>(1:40 - 1:50)"]
    Pitch --> CV["๐Ÿค Core Values Challenge<br/>'Yes, And...' Chain<br/>(1:50 - 2:00)"]

    style Demo fill:#e0f2fe,stroke:#0284c7,stroke-width:1.5px;
    style Split fill:#fef08a,stroke:#eab308,stroke-width:1.5px;
    style Pitch fill:#dcfce7,stroke:#16a34a,stroke-width:1.5px;
    style CV fill:#fce7f3,stroke:#db2777,stroke-width:1.5px;

1. Mentor Demo (1:10 โ€“ 1:14 PM โ€ข 4 min)

  • Two mentors deliver a model presentation:
  • 2-Minute Pitch: Crisp introduction, problem statement (deforestation & habitat fragmentation), innovative solution, and domain expert feedback.
  • 2-Minute Mock Q&A: Mentors demonstrate how to handle judge questionsโ€”passing questions to teammates smoothly ("Great question, our lead researcher can answer that...") rather than interrupting or talking over one another.

2. Strike Team Breakouts (1:14 โ€“ 1:40 PM โ€ข 26 min)

Students break into 3 designated strike teams (Note: Teams will swap roles next session!):

  • Group 1: The Builders (Physical Prototypes)
  • Lead: Tinkaton (Prototype Lead).
  • Focus: Build physical mockups of the proposed solution (e.g., biodegradable seed drop pod, sensor-rigged wildlife canopy corridor, or compostable packaging sample).
  • Deliverable: A tangible 3D proof-of-concept that can be held and demonstrated during the presentation.

  • Group 2: The Researchers (Paper Usage & Biodiversity Data)

  • Lead: Alakazam (Research Lead).
  • Focus: Deep-dive into statistics on industrial paper consumption, local native tree survival rates, and biodiversity loss.
  • Deliverable: 3 hard facts/citations formatted as high-impact callout cards for our presentation board.

  • Group 3: The Marketers (Slogans, Themes & Hooks)

  • Lead: Dragonite (Outreach Coordinator) & Jigglypuff (Creative Director).
  • Focus: Brainstorm catchy project titles, memorable slogans, opening hooks, and audience engagement elements.
  • Deliverable: 2 strong project title options, a 10-second elevator pitch hook, and proposed presentation theme.

3. Present Findings (1:40 โ€“ 1:50 PM โ€ข 10 min)

  • Each group gets 2 minutes to present + 1โ€“2 minutes Q&A.
  • STRICT RULE: Every student in the group must speak at least once.
  • Mentors practice gentle, supportive timer management. Teammates applaud each group.

4. Team Challenge: Core Values Activity (1:50 โ€“ 2:00 PM โ€ข 10 min)

  • The "Yes, And..." Solution Improv Challenge:
  • Students stand in a circle. One student offers a feature idea for our project: "What if our seed pods had natural chili powder to repel squirrels?"
  • The next student must respond: "YES, AND... we can make the casing from recycled pressed fallen leaves!"
  • Coaching takeaway: Reinforce Plus'ing and psychological safetyโ€”building on ideas rather than shutting them down with "No, but...".

2:00 โ€“ 2:10 PM | Block 2: Team Identity & Logo Prototypes (10 min)

  • Coach Presentation: Display 3 digital logo concepts for "Lego Legends" (incorporating BIOGLOW bioluminescent teal, neon lime, robotics gear, and team mascot motifs).
  • Feedback Round: Students discuss:
  • Which color combinations stand out best from 10 feet away?
  • What typography feels energetic and legible?
  • What tweaks or personalized touches should be added before the final vote next week?
  • Jigglypuff records team notes for the final graphic revisions.

2:10 โ€“ 2:20 PM | Bio Break, Snack & Physical Reset (10 min)

  • Mandatory hands-off-screens break.
  • Healthy snack, water refill, and bathroom visit.
  • Prep the robot table, download fresh code projects, and align mission models.

2:20 โ€“ 3:50 PM | Block 3: Robot Game โ€” 3-Track Mission Coding (90 min)

๐Ÿ’ก Core Mantra: Reliable Points, Not Perfection!
An 80-point run that succeeds 9 times out of 10 always beats a theoretical 150-point run that fails under competition pressure. Build consistent routines!

flowchart TD
    subgraph TrackA["Team A: Static Missions"]
        M01["M01: Drone Survey (30 pts)"]
        M03["M03: Flip the Rock (30 pts)"]
        M06["M06: Leafcutter Frenzy (30 pts)"]
        M11["M11: Artificial Reef (20 pts)"]
    end

    subgraph TrackB["Team B: Dynamic Missions"]
        M02["M02: Exploding Seeds (30 pts - 3 Seeds!)"]
        M04["M04: Lucky Leaves (30 pts)"]
        M13["M13: Coral Nursery (20 pts)"]
    end

    subgraph TrackC["Team C: R&D Scouting"]
        M05["M05: Reaching Roots (30 pts)"]
        M07["M07: Bioluminescent Algae (30 pts)"]
        M14["M14: Seeds of Renewal (20 pts)"]
    end

    style TrackA fill:#e0f2fe,stroke:#0284c7,stroke-width:1.5px;
    style TrackB fill:#fef08a,stroke:#eab308,stroke-width:1.5px;
    style TrackC fill:#dcfce7,stroke:#16a34a,stroke-width:1.5px;

Squad Breakdown & 15-Minute Role Rotations

Teams work simultaneously with roles rotating every ~15 minutes (Coder $\leftrightarrow$ Builder $\leftrightarrow$ Mat Tester / Scorekeeper):

  • Team A (Static Missions โ€” Push, Flip & Drop):
  • Assigned Missions: M01 (Drone Survey - 30 pts), M03 (Flip the Rock - 30 pts), M06 (Leafcutter Frenzy - 30 pts), M11 (Artificial Reef - 20 pts).
  • Focus: Simple, reliable physical pushers and passive bumpers. Code straight drives with gyro-assisted stabilization.
  • Key Milestone: Achieve a clean 3-consecutive-run completion of M01 and M03.

  • Team B (Dynamic Missions โ€” Trigger & Release Mechanisms):

  • Assigned Missions: M02 (Exploding Seeds - trigger stalk for all 3 seeds = 30 pts), M04 (Lucky Leaves - 30 pts), M13 (Coral Nursery - 20 pts).
  • Focus: Motorized lever arm or weighted ramp to trigger the seed release stalk on M02. Test attachment clearance and motor angles.
  • Key Milestone: Verify that all 3 seeds on M02 consistently pop free.

  • Team C (R&D Scouting โ€” Pathing & Complex Actuation):

  • Assigned Missions: M05 (Reaching Roots - 30 pts), M07 (Bioluminescent Algae - 30 pts), M14 (Seeds of Renewal - 20 pts).
  • Focus: Measure wheel distances, test table angles, and prototype passive guide walls. Draft routing maps showing how these missions could combine with earlier runs.
  • Key Milestone: Produce a feasibility scorecard with recommended attachment designs.

3:50 โ€“ 4:00 PM | Wrap-Up, Clean-Up Sprint & Shout-Outs (10 min)

  • Clean-Up Sprint (5 min):
  • Power down SPIKE Prime hubs and connect to chargers (Meowth audits).
  • Sort loose Technic beams, pins, and axle bins (Tinkaton leads).
  • Save all project files with standardized naming: 2026-10-25_RunA_v1.
  • Circle Debrief & Core Values Shout-Outs (5 min):
  • Each student gives a shout-out to a teammate who displayed great teamwork or persistence today.
  • Mentors celebrate the high energy of parallel strike teams and preview the Group Swap for Session 2 (Nov 1).

๐ŸŽฏ Coach's Success & Evaluation Criteria

  • All 3 Innovation Strike Teams delivered their assigned output within the 26-minute sprint.
  • Every single student spoke during the Innovation findings presentation.
  • Team reviewed digital logo concepts and provided concrete feedback on colors and fonts.
  • Team A successfully coded and tested at least 2 static missions on the table.
  • Team B prototyped an attachment capable of triggering M02 (all 3 seeds released for 30 pts).
  • Team C documented initial pathing and feasibility for M05, M07, and M14.
  • Hubs, laptops, and field models safely stored and plugged in for charging.